Conclusion

In conclusion the objectives of the project are almost achieved .The power electronics circuit was implemented, tested and simulated .All needed calculation for turbine output voltage, full wave bridge rectifier with AC circuit parameters and output voltage and the Buck-Boost parameters and output voltage were done. Also improvements were done for the circuits to achieve a good performance and to reduce the voltage losses. Since the suitable hydro turbine which meets the design requirements cannot be founded it was replaced by a transformer which feeds almost the same amount of the calculated voltage from the turbine. The power electronic part was implemented and design and the results were the almost same the calculated and simulated results which is an indication of the ability of the circuit to achieve the desired goal from the project which charging a 3v battery.